Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Maple), Granite , Recessed, in-cabinet, pendent and under cabinet lighting, Ceramic TileCeramic Tile w/ custom pattern
Highlights: Full kitchen Installation as shown
Time (start to finish): Three weeks
Favorite Feature: Long Buffet Island
|
|
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Maple), Granite , Recessed, in-cabinet, and under cabinet lighting, Ceramic , Ceramic Tile
Highlights: Full kitchen installation
Time (start to finish): Two Weeks and three days
Favorite Feature: Unique tableware storage system.
|
 |
|
|
 |
Cabinets: DECORA’ Cherry
Highlights: Custom Designed entertainment system, fully wired . Dimensions 100”W X 84”H X 19”D
Time (start to finish): Two Days
Favorite Feature: The finished fit around the 62” Flat Screen TV
|
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: Kemper (Maple), Uba Tuba Granite , Recessed, , pendent and under cabinet lighting, Hardwood, Matching granite tiles
Highlights: Full kitchen Installation into new Construction.
Time (start to finish): Seven Days
Favorite Feature: Custom multilevel Island
|
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: Decora (Maple) Granite , Recessed and in cabinet lighting, Hardwood, Matching Tumbled marble tiles
Highlights: Multiple height wall cabinets to accommodate soffit.
Time (start to finish): Designed and Supplied by KBW (Installed by others)
Favorite Feature: Use of stacked wall cabinets with lighted display area
|
| |
|
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY (Maple), Cranberry Brown Granite , Recessed, and under cabinet lighting, Ceramic tile, Special tile Pattern
Highlights: Removed staircase and basement entrance. Chase is hidden behind diagonal Oven cabinet.
Time (start to finish): Four Weeks
Favorite Feature: Panels over sink disappear into a wall pocket for easy family room access. Unique ramp access to basement for the family felines. Photos available upon request. |
 |
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: Decora , Granite , Ceramic tile, Ceramic tile (custom Pattern)
Highlights: Soffits were removed, Elaborate Trim and Case work Extensive lighting upgrades and changes.
Time (start to finish): 3 ½ Weeks
Favorite Feature: Corner Curio and Tile splash treatment.
|
 |
|
|
 |
Cabinets, Fixtures, Lighting, Floors: Kemper (Maple), Brizo, Bain Ultra, St Thomas Creations , Recessed, lighting, Ceramic tile , Ceramic Tile
Highlights: Washer Dryer Area ( not shown) Custom Shower w/ multiple shower heads, Free Standing Hydro-Massage Tub, Custom Vanity Area, Custom Entry Doors, Custom shower and vanity glazings.
Time (start to finish): Six Weeks
Favorite Feature: Custom shower with seat and multiple spray locations.
|
   |
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY, Laminate wood edge , Recessed and undercabinet lighting, Hardwood, special tile pattern
Highlights: Removed two walls to enlarge space. Removed soffits and rearranged plumbing to accommodate taller cabinets.
Time (start to finish): Four Weeks
Favorite Feature: Dishwasher placed diagonally in corner.
|
 |
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Cherry), Granite , Recessed, in-cabinet, pendent and under cabinet lighting, Ceramic tile, Ceramic tile (custom Pattern)
Highlights: Soffits were removed, Window replaced, Extensive lighting upgrades and changes.
Time (start to finish): Five Weeks
Favorite Feature: Corner Range Application with Special Tile insert.
|
|
|
 |
Fixtures, Lighting, Floors: Cast soaking tub (outside painted on site) Period pedestal sink, and Toilet
Highlights: Stylish wall covering
Time (start to finish): Supplied by KBW (Installed by others)
Favorite Feature: Original pine board floors (refinished)
|
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: RICHMAID (Birch), Carrara white marble , Recessed, in-cabinet, pendent and under cabinet lighting, Hardwood, Decorative Tin
Highlights: Built dormer addition to create a vaulted ceiling, Removed Butlers pantry, Added Arched Dining entry, New Windows, Moved Doors, Added Tin Ceilings, Custom Millwork to match original home, Installed kitchen , Floors & Electrical.
Time (start to finish): Six Weeks
Favorite Feature: Custom Sideboard to match kitchen
|
|
|
 |
Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY (Maple), Cranberry Brown Granite , Recessed, in-cabinet, pendent and under cabinet lighting, Hardwood, Matching granite tiles
Highlights: Added a second (vegetable) sink. Commercial styled range.
Soffits removed and cabinet built to the ceiling.
Time (start to finish): Three Weeks
Favorite Feature: Window pane feature built into several upper cabinet doors.
|
 |
|
|
 |
Fixtures, Lighting, Floors: Custom shower installation w/ custom shower door.
Highlights: Unique tile work
Time (start to finish): Part of full bath install by KBW (3 weeks)
Favorite Feature: Unique step up glass shelving system.
|
| |
|
|