On Sale Now

Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Maple), Granite , Recessed, in-cabinet, pendent and under cabinet lighting, Ceramic TileCeramic Tile w/ custom pattern

Highlights: Full kitchen Installation as shown

Time (start to finish): Three weeks

Favorite Feature: Long Buffet Island


Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Maple), Granite , Recessed, in-cabinet, and under cabinet lighting, Ceramic , Ceramic Tile

Highlights: Full kitchen installation

Time (start to finish): Two Weeks and three days

Favorite Feature: Unique tableware storage system.


Cabinets: DECORA’ Cherry

Highlights: Custom Designed entertainment system, fully wired . Dimensions 100”W X 84”H X 19”D

Time (start to finish): Two Days

Favorite Feature: The finished fit around the 62” Flat Screen TV


Cabinets, Tops, Lighting, Floors, Backsplash: Kemper (Maple), Uba Tuba Granite , Recessed, , pendent and under cabinet lighting, Hardwood, Matching granite tiles

Highlights: Full kitchen Installation into new Construction.

Time (start to finish): Seven Days

Favorite Feature: Custom multilevel Island


Cabinets, Tops, Lighting, Floors, Backsplash: Decora  (Maple) Granite , Recessed and in cabinet  lighting, Hardwood, Matching Tumbled marble  tiles

Highlights: Multiple height wall cabinets to accommodate soffit.

Time (start to finish): Designed and Supplied by KBW  (Installed by others)

Favorite Feature: Use of stacked wall cabinets with lighted display area

 

Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY  (Maple), Cranberry Brown Granite , Recessed, and under cabinet lighting, Ceramic tile, Special tile Pattern

Highlights: Removed staircase and basement entrance. Chase is hidden behind diagonal Oven cabinet.

Time (start to finish): Four Weeks

Favorite Feature: Panels over sink disappear into a wall pocket for easy family room access.  Unique ramp access to basement for the family felines. Photos available upon request.

Cabinets, Tops, Lighting, Floors, Backsplash: Decora , Granite , Ceramic tile, Ceramic tile (custom Pattern)

Highlights: Soffits were removed, Elaborate Trim and Case work Extensive lighting upgrades and changes.

Time (start to finish): 3 ½ Weeks

Favorite Feature: Corner Curio and Tile splash treatment.


Cabinets, Fixtures, Lighting, Floors: Kemper  (Maple), Brizo, Bain Ultra, St Thomas Creations , Recessed, lighting, Ceramic tile , Ceramic Tile

Highlights: Washer Dryer Area ( not shown) Custom Shower w/ multiple shower heads, Free Standing Hydro-Massage Tub, Custom Vanity Area, Custom Entry Doors, Custom shower and vanity glazings.

Time (start to finish): Six Weeks

Favorite Feature: Custom shower with seat and multiple spray locations.


Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY, Laminate wood edge , Recessed and undercabinet lighting, Hardwood, special tile pattern

Highlights: Removed two walls to enlarge space. Removed soffits and rearranged plumbing to accommodate taller cabinets.

Time (start to finish): Four Weeks

Favorite Feature: Dishwasher placed diagonally in corner.


Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Cherry), Granite , Recessed, in-cabinet, pendent and under cabinet lighting, Ceramic tile, Ceramic tile (custom Pattern)

Highlights: Soffits were removed, Window replaced, Extensive lighting upgrades and changes.

Time (start to finish): Five Weeks

Favorite Feature: Corner Range Application with Special Tile insert.


Fixtures, Lighting, Floors: Cast soaking tub (outside painted on site) Period pedestal sink, and Toilet

Highlights: Stylish wall covering

Time (start to finish): Supplied by KBW  (Installed by others)

Favorite Feature: Original pine board floors (refinished)


Cabinets, Tops, Lighting, Floors, Backsplash: RICHMAID  (Birch), Carrara white marble , Recessed, in-cabinet, pendent and under cabinet lighting, Hardwood, Decorative Tin

Highlights: Built dormer addition to create a vaulted ceiling, Removed Butlers pantry, Added Arched Dining entry, New Windows, Moved Doors, Added Tin Ceilings, Custom Millwork to match original home, Installed kitchen , Floors & Electrical.

Time (start to finish): Six Weeks

Favorite Feature: Custom Sideboard to match kitchen


Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY  (Maple), Cranberry Brown Granite , Recessed, in-cabinet, pendent and under cabinet lighting, Hardwood, Matching granite tiles

Highlights: Added a second (vegetable) sink. Commercial styled range. Soffits removed and cabinet built to the ceiling.

Time (start to finish): Three Weeks

Favorite Feature: Window pane feature built into several upper cabinet doors.


Fixtures, Lighting, Floors: Custom shower installation w/ custom shower door.

Highlights: Unique tile work

Time (start to finish): Part of full bath install by KBW (3 weeks)

Favorite Feature: Unique step up glass shelving system.

 
© 2008 Kitchen & Bath World, Inc. | 1980 Central Avenue | Albany, NY 12205
Phone: 518-464-0660 | Fax: 518-464-9561
Developed by Mercury Web Solutions