Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Maple), granite, recessed, in-cabinet, pendent and under cabinet lighting, ceramic TileCeramic tile w/ custom pattern.
Highlights: Full kitchen installation as shown.
Time (start to finish): Three weeks.
Favorite Feature: Long buffet island.

Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Maple), granite, recessed, in-cabinet, and under cabinet lighting, ceramic, ceramic tile.
Highlights: Full kitchen installation.
Time (start to finish): Two weeks and three days.
Favorite Feature: Unique tableware storage system.

Cabinets: DECORA Cherry.
Highlights: Custom designed entertainment system, fully wired. Dimensions 100”W X 84”H X 19”D.
Time (start to finish): Two days.
Favorite Feature: The finished fit around the 62” flat screen TV.

Cabinets, Tops, Lighting, Floors, Backsplash: Kemper (Maple), Uba Tuba granite, recessed, pendent and under cabinet lighting, hardwood, matching granite tiles.
Highlights: Full kitchen installation into new construction.
Time (start to finish): Seven days.
Favorite Feature: Custom multilevel island.

Cabinets, Tops, Lighting, Floors, Backsplash: Decora (Maple) granite, recessed and in cabinet lighting, hardwood, matching tumbled marble tiles.
Highlights: Multiple height wall cabinets to accommodate soffit.
Time (start to finish): Designed and supplied by KBW (installed by others).
Favorite Feature: Use of stacked wall cabinets with lighted display area.

Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY (Maple), cranberry brown granite, recessed, and under cabinet lighting, ceramic tile, special tile pattern.
Highlights: Removed staircase and basement entrance. Chase is hidden behind diagonal oven cabinet.
Time (start to finish): Four weeks.
Favorite Feature: Panels over sink disappear into a wall pocket for easy family room access. Unique ramp access to basement for the family felines. Photos available upon request.

Cabinets, Tops, Lighting, Floors, Backsplash: DECORA, granite, ceramic tile, ceramic tile (custom pattern).
Highlights: Soffits were removed. Elaborate trim and case work. Extensive lighting upgrades and changes.
Time (start to finish): 3 1/2 weeks.
Favorite Feature: Corner curio and tile splash treatment.

Cabinets, Fixtures, Lighting, Floors: Kemper (Maple), Brizo, Bain Ultra, St. Thomas Creations, recessed, lighting, ceramic tile, ceramic tile.
Highlights: Washer-dryer area (not shown), custom shower w/ multiple shower heads, free standing hydro-massage tub, custom vanity area, custom entry doors, custom shower and vanity glazings.
Time (start to finish): Six weeks.
Favorite Feature: Custom shower with seat and multiple spray locations.

Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY, laminate wood edge, recessed and undercabinet lighting, hardwood, special tile pattern.
Highlights: Removed two walls to enlarge space. Removed soffits and rearranged plumbing to accommodate taller cabinets.
Time (start to finish): Four weeks.
Favorite Feature: Dishwasher placed diagonally in corner.

Cabinets, Tops, Lighting, Floors, Backsplash: DECORA (Cherry), granite, recessed, in-cabinet, pendent and under cabinet lighting, ceramic tile, ceramic tile (custom pattern).
Highlights: Soffits were removed. Window replaced. Extensive lighting upgrades and changes.
Time (start to finish): Five weeks.
Favorite Feature: Corner range application with special tile insert.

Fixtures, Lighting, Floors: Cast soaking tub (outside painted on site), period pedestal sink and toilet.
Highlights: Stylish wall covering.
Time (start to finish): Supplied by KBW (installed by others).
Favorite Feature: Original pine board floors (refinished).

Cabinets, Tops, Lighting, Floors, Backsplash: RICHMAID (Birch), carrara white marble, recessed, in-cabinet, pendent and under cabinet lighting, hardwood, decorative tin.
Highlights: Built dormer addition to create a vaulted ceiling, removed butlers pantry, added arched dining entry, new windows, moved doors, added tin ceilings, custom millwork to match original home, installed kitchen, floors and electrical.
Time (start to finish): Six weeks.
Favorite Feature: Custom sideboard to match kitchen.

Cabinets, Tops, Lighting, Floors, Backsplash: PLAIN & FANCY (Maple), cranberry brown granite, recessed, in-cabinet, pendent and under cabinet lighting, hardwood, matching granite tiles.
Highlights: Added a second (vegetable) sink. Commercial styled range. Soffits removed and cabinet built to the ceiling.
Time (start to finish): Three weeks.
Favorite Feature: Window pane feature built into several upper cabinet doors.

Fixtures, Lighting, Floors: Custom shower installation w/ custom shower door.
Highlights: Unique tile work.
Time (start to finish): Part of full bath install by KBW (3 weeks).
Favorite Feature: Unique step up glass shelving system.